Query
El Dorado Springs Solar Farm
Type
Entity Briefing
Entity
El Dorado Springs Solar Farm
State
CO
Generated
2026-10-10T10:08:43.891Z

Briefing on El Dorado Springs Solar Farm

Entity Briefing
Generated Oct 10, 2026·Dataset freshness not reported
3 MW
Capacity
Operating
Current status
2018
Operating since
1
Generators
19.0%
Capacity factor
4 GWh
Annual generation
Briefing/plantOperating

El Dorado Springs Solar Farm is a 3 MW Solar Photovoltaic asset in SPP (Southwest Power Pool), currently Operating.

El Dorado Springs Solar Farm is reported in Missouri since 2018 under Missouri Jnt Muni.Pwr Elec. Ut. Comm.. Available operating and financial measures include 19.0% capacity factor and 4 GWh annual generation; $30.2/MWh reported energy value.

Location
Cedar, Missouri
Technology
Solar Photovoltaic
Owner / parent
Missouri Jnt Muni.Pwr Elec. Ut. Comm.
Operator
Missouri Jnt Muni.Pwr Elec. Ut. Comm.
Grid
SPP (Southwest Power Pool)
Plant ID
61566

What stands out

1

El Dorado Springs Solar Farm is a 3 MW Solar Photovoltaic asset in Missouri with status Operating.

2

Latest annual operating measures report 19.0% capacity factor and 4 GWh annual generation.

3

Available financial measures include $30.2/MWh energy value.

Market and operating context

ISO / market
SPP (Southwest Power Pool)
Balancing authority
Southwest Power Pool
NERC region
MRO
State rank
#37 of 41
National rank
#4915 of 7,971

Why it matters

For this asset in SPP (Southwest Power Pool), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.