Query
El Dorado County
Type
Entity Briefing
Entity
El Dorado County
State
CO
Generated
2026-09-29T23:15:39.716Z

Briefing on El Dorado County

Entity Briefing
Generated Sep 29, 2026·Dataset freshness not reported
2 MW
Capacity
Operating
Current status
2021
Operating since
1
Generators
22.2%
Capacity factor
3 GWh
Annual generation
Briefing/plantOperating

El Dorado County is a 2 MW Solar Photovoltaic asset in CAISO (California), currently Operating.

El Dorado County is reported in California since 2021 under SkyHigh 2 Solar. Available operating and financial measures include 22.2% capacity factor and 3 GWh annual generation; $25.4/MWh reported energy value.

Location
El Dorado, California
Technology
Solar Photovoltaic
Owner / parent
SkyHigh 2 Solar
Operator
SkyHigh 2 Solar
Grid
CAISO (California)
Plant ID
64402

What stands out

1

El Dorado County is a 2 MW Solar Photovoltaic asset in California with status Operating.

2

Latest annual operating measures report 22.2% capacity factor and 3 GWh annual generation.

3

Available financial measures include $25.4/MWh energy value.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#770 of 992
National rank
#6730 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.