El Cajon Energy Center is a 61 MW Natural Gas Fired Combustion Turbine asset in CAISO (California), currently Operating.
El Cajon Energy Center is reported in California since 2010 under Wellhead Electric Company. Available operating and financial measures include 1.7% capacity factor and 9 GWh annual generation; $965/kW reported CapEx.
- Location
- San Diego, California
- Technology
- Natural Gas Fired Combustion Turbine
- Owner / parent
- Wellhead Electric Company
- Operator
- Wellhead Services, Inc
- Grid
- CAISO (California)
- Plant ID
- 57001
What stands out
El Cajon Energy Center is a 61 MW Natural Gas Fired Combustion Turbine asset in California with status Operating.
Latest annual operating measures report 1.7% capacity factor and 9 GWh annual generation.
Available financial measures include $965/kW CapEx.
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #94 of 303
- National rank
- #1087 of 2,025
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.