Briefing/projectactive
Eighteenmile Solar SLF is a 153 MW Solar+Battery project in Texas, currently active.
Weser Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2026-12-01.
- Queue ID
- ERCOT-24INR0061
- Location
- Goliad, Texas
- Technology
- Solar+Battery
- Developer
- Weser Solar, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 138kV 5730 Four Corners - 5728 Choate
What stands out
1
Eighteenmile Solar SLF is a 153 MW Solar+Battery project in Texas with status active.
2
Weser Solar, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2026-12-01.
Market and operating context
- Queue date
- 2021-08-18
- Proposed COD
- 2026-12-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.