Edwards Sanborn E2 is a 258 MW Batteries asset in CAISO (California), currently Operating.
Edwards Sanborn E2 is reported in California since 2021 under Terra-Gen Operating Co-Hybrid. Available operating and financial measures include 13.3% capacity factor and 301 GWh annual generation; $10.0/MWh reported energy value.
- Location
- Kern, California
- Technology
- Batteries, Solar Photovoltaic
- Owner / parent
- Terra-Gen Operating Co-Hybrid
- Operator
- Terra-Gen Operating Co-Hybrid
- Grid
- CAISO (California)
- Plant ID
- 64879
What stands out
Edwards Sanborn E2 is a 258 MW Batteries asset in California with status Operating.
Latest annual operating measures report 13.3% capacity factor and 301 GWh annual generation.
Available financial measures include $10.0/MWh energy value.
Latest linked story: “Edwards & Sanborn Solar + storage Kern County, California” (Construction Review, 2025-08-07).
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #42 of 992
- National rank
- #203 of 7,971
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.