Query
Eddy II
Type
Entity Briefing
Entity
Eddy II
Summary generated
Oct 17, 2026
First saved
Date not recorded

Briefing on Eddy II

Entity Briefing

Summary generated Oct 17, 2026 (UTC).

Source dates used by this summary were not recorded.

10 MW
Capacity
Operating
Current status
2018
Operating since
1
Generators
18.9%
Capacity factor
17 GWh
Annual generation
Briefing/plantOperating

Eddy II is a 10 MW Solar Photovoltaic asset in ERCOT (Texas), currently Operating.

Eddy II is reported in Texas since 2018 under Cypress Creek Renewables. Available operating and financial measures include 18.9% capacity factor and 17 GWh annual generation; $16.7/MWh reported energy value.

Location
McLennan, Texas
Technology
Solar Photovoltaic
Owner / parent
Cypress Creek Renewables
Operator
Cypress Creek Renewables
Grid
ERCOT (Texas)
Plant ID
61874

What stands out

1

Eddy II is a 10 MW Solar Photovoltaic asset in Texas with status Operating.

2

Latest annual operating measures report 18.9% capacity factor and 17 GWh annual generation.

3

Available financial measures include $16.7/MWh energy value.

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#319 of 378
National rank
#2196 of 7,971

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.