Briefing/plantOperating
Eddy II is a 10 MW Solar Photovoltaic asset in ERCOT (Texas), currently Operating.
Eddy II is reported in Texas since 2018 under Cypress Creek Renewables. Available operating and financial measures include 18.9% capacity factor and 17 GWh annual generation; $16.7/MWh reported energy value.
- Location
- McLennan, Texas
- Technology
- Solar Photovoltaic
- Owner / parent
- Cypress Creek Renewables
- Operator
- Cypress Creek Renewables
- Grid
- ERCOT (Texas)
- Plant ID
- 61874
What stands out
1
Eddy II is a 10 MW Solar Photovoltaic asset in Texas with status Operating.
2
Latest annual operating measures report 18.9% capacity factor and 17 GWh annual generation.
3
Available financial measures include $16.7/MWh energy value.
Market and operating context
- ISO / market
- ERCOT (Texas)
- Balancing authority
- Electric Reliability Council of Texas, Inc.
- NERC region
- TRE
- State rank
- #319 of 378
- National rank
- #2196 of 7,971
Why it matters
For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.