Echols Creek Storage
Type
Entity Briefing
Entity
Echols Creek Storage
Generated
2026-10-19T16:44:55.835Z

Briefing on Echols Creek Storage

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
101 MW
Proposed capacity
suspended
Current status
Other
Technology
ERCOT
Market / region
2027-10-13
Proposed COD
IA Pending
Queue phase
Briefing/projectsuspended

Echols Creek Storage is a 101 MW Other project in Texas, currently suspended.

BT Ferguson Solar, is the reported developer. The reported queue phase is IA Pending. Proposed COD is 2027-10-13.

Queue ID
ERCOT-25INR0369
Location
Lamar, Texas
Technology
Other
Developer
BT Ferguson Solar,
Market / region
ERCOT
Point of interconnection
Tap 138kV Hawk Hollow Switch (#11768) and Lamar Blossom Switch (#11770)

What stands out

1

Echols Creek Storage is a 101 MW Other project in Texas with status suspended.

2

BT Ferguson Solar, is the reported developer.

3

The reported queue phase is IA Pending; proposed COD is 2027-10-13.

Market and operating context

Queue date
2023-04-06
Proposed COD
2027-10-13
IA status
IA Pending
Study phase
IA Pending

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Echols Creek Storage — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0369
LocationLamar, Texas
TechnologyOther
DeveloperBT Ferguson Solar,
Market / regionERCOT
Point of interconnectionTap 138kV Hawk Hollow Switch (#11768) and Lamar Blossom Switch (#11770)
Queue date2023-04-06
Proposed COD2027-10-13