Query
East Side
Type
Entity Briefing
Entity
East Side
Generated
2026-10-19T14:10:03.129Z

Briefing on East Side

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
3 MW
Capacity
Operating
Current status
1924
Operating since
1
Generators
0.0%
Capacity factor
0 GWh
Annual generation
Briefing/plantOperating

East Side is a 3 MW Conventional Hydroelectric asset in Oregon, currently Operating.

East Side is reported in Oregon since 1924 under Berkshire Hathaway. Available operating and financial measures include 0.0% capacity factor and 0 GWh annual generation.

Location
Klamath, Oregon
Technology
Conventional Hydroelectric
Owner / parent
Berkshire Hathaway
Operator
PacifiCorp
Grid
PacifiCorp - West
Plant ID
3025

What stands out

1

East Side is a 3 MW Conventional Hydroelectric asset in Oregon with status Operating.

2

Latest annual operating measures report 0.0% capacity factor and 0 GWh annual generation.

Market and operating context

Balancing authority
PacifiCorp - West
NERC region
WECC
State rank
#50 of 63
National rank
#1041 of 1,462

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.