Query
EAST FIELD ENERGY STORAGE
Type
Entity Briefing
Entity
EAST FIELD ENERGY STORAGE
Technology
battery
Generated
2026-10-06T20:21:41.135Z

Briefing on EAST FIELD ENERGY STORAGE

Entity Briefing
Generated Oct 6, 2026·Dataset freshness not reported
313 MW
Proposed capacity
active
Current status
Battery
Technology
CAISO
Market / region
2030-06-25
Proposed COD
C13
Queue phase
Briefing/projectactive

EAST FIELD ENERGY STORAGE is a 313 MW Battery project in California, currently active.

The reported queue phase is C13. Proposed COD is 2030-06-25.

Queue ID
CAISO-1810
Location
San Diego, California
Technology
Battery
Market / region
CAISO
Point of interconnection
Otay Mesa Switchyard 230 kV

What stands out

1

EAST FIELD ENERGY STORAGE is a 313 MW Battery project in California with status active.

2

The reported queue phase is C13; proposed COD is 2030-06-25.

3

Latest linked story: “LA residents protest new battery storage facility, fearing fire risk and a link to AI data centers” (LA Public Press, 2026-01-28).

Market and operating context

Queue date
2020-04-15
Proposed COD
2030-06-25
IA status
IA Executed
Study phase
C13
Service type
ERIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

EAST FIELD ENERGY STORAGE — verified asset snapshot

FieldValue
Queue IDCAISO-1810
LocationSan Diego, California
TechnologyBattery
Market / regionCAISO
Point of interconnectionOtay Mesa Switchyard 230 kV
Queue date2020-04-15
Proposed COD2030-06-25
IA statusIA Executed