Briefing on East Campus Utility Plant

Entity Briefing

Summary generated Oct 10, 2026 (UTC).

Source dates used by this summary were not recorded.

6 MW
Capacity
Operating
Current status
2006
Operating since
3
Generators
0.9%
Capacity factor
0 GWh
Annual generation
Briefing/plantOperating

East Campus Utility Plant is a 6 MW Petroleum Liquids asset in PJM Interconnection, currently Operating.

East Campus Utility Plant is reported in Ohio since 2006 under University of Cincinnati. Available operating and financial measures include 0.9% capacity factor and 0 GWh annual generation; $765/kW reported CapEx.

Location
Hamilton, Ohio
Technology
Petroleum Liquids
Owner / parent
University of Cincinnati
Operator
University of Cincinnati
Grid
PJM Interconnection
Plant ID
57929

What stands out

1

East Campus Utility Plant is a 6 MW Petroleum Liquids asset in Ohio with status Operating.

2

Latest annual operating measures report 0.9% capacity factor and 0 GWh annual generation.

3

Available financial measures include $765/kW CapEx.

Market and operating context

ISO / market
PJM Interconnection
Balancing authority
PJM Interconnection, LLC
NERC region
RFC
State rank
#17 of 36
National rank
#434 of 825

Why it matters

For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.