East Bend is a 772 MW Conventional Steam Coal asset in PJM Interconnection, currently Operating.
East Bend is reported in Kentucky since 1981 under Duke Energy. Available operating and financial measures include 38.4% capacity factor and 2598 GWh annual generation; $1380/kW reported CapEx.
- Location
- Boone, Kentucky
- Technology
- Conventional Steam Coal
- Owner / parent
- Duke Energy
- Operator
- Duke Energy Kentucky Inc
- Grid
- PJM Interconnection
- Plant ID
- 6018
What stands out
East Bend is a 772 MW Conventional Steam Coal asset in Kentucky with status Operating.
Latest annual operating measures report 38.4% capacity factor and 2598 GWh annual generation.
Available financial measures include $55.0/MWh OpEx, $1380/kW CapEx.
Latest linked story: “Duke Energy proposes special rules for data centers in North Carolina” (Canary Media, 2026-07-06).
Market and operating context
- ISO / market
- PJM Interconnection
- Balancing authority
- PJM Interconnection, LLC
- NERC region
- RFC
- State rank
- #5 of 7
- National rank
- #41 of 66
Why it matters
For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.