Query
Easley Solar
Type
Entity Briefing
Entity
Easley Solar
Summary generated
Oct 17, 2026
First saved
Date not recorded

Briefing on Easley Solar

Entity Briefing

Summary generated Oct 17, 2026 (UTC).

Source dates used by this summary were not recorded.

940 MW
Capacity
Under construction
Current status
3
Generators
Briefing/plantUnder construction

Easley Solar is a 940 MW Batteries asset in CAISO (California), currently Under construction.

Easley Solar is reported in California under IP Easley, LLC. Available operating and financial measures include $1544/kW reported CapEx.

Location
Riverside, California
Technology
Batteries, Solar Photovoltaic
Owner / parent
IP Easley, LLC
Operator
IP Easley, LLC
Grid
CAISO (California)
Plant ID
68758

What stands out

1

Easley Solar is a 940 MW Batteries asset in California with status Under construction.

2

Available financial measures include $1544/kW CapEx.

3

Latest linked story: “Satisfying Settlement: After Two-Plus Years of Stress and Expense, Lake Tamarisk Residents Reach an Agreement With Intersect Power Regarding the Easley Solar Project” (Coachella Valley Independent, 2025-01-22).

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#4 of 202
National rank
#13 of 994

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Easley Solar — verified asset snapshot

FieldValue
LocationRiverside, California
TechnologyBatteries, Solar Photovoltaic
Owner / parentIP Easley, LLC
OperatorIP Easley, LLC
GridCAISO (California)
Plant ID68758
ISO / marketCAISO (California)
Balancing authorityCalifornia Independent System Operator