Eagle Springs Solar is a 77 MW Solar+Battery project in Texas, currently active.
Eagle Springs Solar, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-12-31.
- Queue ID
- ERCOT-24INR0137
- Location
- Delta, Texas
- Technology
- Solar+Battery
- Developer
- Eagle Springs Solar, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap Lake Creek Substation (#6835) – Enloe Switching station (#6834) 138 kV Line
What stands out
1
Eagle Springs Solar is a 77 MW Solar+Battery project in Texas with status active.
2
Eagle Springs Solar, LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2026-12-31.
Market and operating context
- Queue date
- 2021-10-18
- Proposed COD
- 2026-12-31
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.