Briefing on Eagle Springs Solar

Entity Briefing
Generated Oct 6, 2026·Dataset freshness not reported
77 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2026-12-31
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Eagle Springs Solar is a 77 MW Solar+Battery project in Texas, currently active.

Eagle Springs Solar, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-12-31.

Queue ID
ERCOT-24INR0137
Location
Delta, Texas
Technology
Solar+Battery
Developer
Eagle Springs Solar, LLC
Market / region
ERCOT
Point of interconnection
Tap Lake Creek Substation (#6835) – Enloe Switching station (#6834) 138 kV Line

What stands out

1

Eagle Springs Solar is a 77 MW Solar+Battery project in Texas with status active.

2

Eagle Springs Solar, LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2026-12-31.

Market and operating context

Queue date
2021-10-18
Proposed COD
2026-12-31
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Eagle Springs Solar — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0137
LocationDelta, Texas
TechnologySolar+Battery
DeveloperEagle Springs Solar, LLC
Market / regionERCOT
Point of interconnectionTap Lake Creek Substation (#6835) – Enloe Switching station (#6834) 138 kV Line
Queue date2021-10-18
Proposed COD2026-12-31