Query
Eagle Springs Hybrid
Type
Entity Briefing
Entity
Eagle Springs Hybrid
Generated
2026-10-10T10:48:00.606Z

Briefing on Eagle Springs Hybrid

Entity Briefing
Generated Oct 10, 2026·Dataset freshness not reported
165 MW
Capacity
Under construction
Current status
2
Generators
Briefing/plantUnder construction

Eagle Springs Hybrid is a 165 MW Batteries asset in ERCOT (Texas), currently Under construction.

Eagle Springs Hybrid is reported in Texas under Samsung C&T. Available operating and financial measures include $1361/kW reported CapEx.

Location
Delta, Texas
Technology
Batteries, Solar Photovoltaic
Owner / parent
Samsung C&T
Operator
Sunraycer Assets I LLC
Grid
ERCOT (Texas)
Plant ID
66341

What stands out

1

Eagle Springs Hybrid is a 165 MW Batteries asset in Texas with status Under construction.

2

Available financial measures include $1361/kW CapEx.

3

Latest linked story: “Sunraycer breaks ground at 620MW solar-plus-storage portfolio in the US” (PV Tech, 2026-03-24).

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#192 of 378
National rank
#500 of 7,971

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Eagle Springs Hybrid — verified asset snapshot

FieldValue
LocationDelta, Texas
TechnologyBatteries, Solar Photovoltaic
Owner / parentSamsung C&T
OperatorSunraycer Assets I LLC
GridERCOT (Texas)
Plant ID66341
ISO / marketERCOT (Texas)
Balancing authorityElectric Reliability Council of Texas, Inc.