Query
Eagle Springs Hybrid
Type
Entity Briefing
Entity
Eagle Springs Hybrid
Summary generated
Oct 10, 2026
First saved
Date not recorded

Briefing on Eagle Springs Hybrid

Entity Briefing

Summary generated Oct 10, 2026 (UTC).

Source dates used by this summary were not recorded.

165 MW
Capacity
Under construction
Current status
2
Generators
Briefing/plantUnder construction

Eagle Springs Hybrid is a 165 MW Batteries asset in ERCOT (Texas), currently Under construction.

Eagle Springs Hybrid is reported in Texas under Samsung C&T. Available operating and financial measures include $1361/kW reported CapEx.

Location
Delta, Texas
Technology
Batteries, Solar Photovoltaic
Owner / parent
Samsung C&T
Operator
Sunraycer Assets I LLC
Grid
ERCOT (Texas)
Plant ID
66341

What stands out

1

Eagle Springs Hybrid is a 165 MW Batteries asset in Texas with status Under construction.

2

Available financial measures include $1361/kW CapEx.

3

Latest linked story: “Sunraycer breaks ground at 620MW solar-plus-storage portfolio in the US” (PV Tech, 2026-03-24).

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#192 of 378
National rank
#500 of 7,971

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Eagle Springs Hybrid — verified asset snapshot

FieldValue
LocationDelta, Texas
TechnologyBatteries, Solar Photovoltaic
Owner / parentSamsung C&T
OperatorSunraycer Assets I LLC
GridERCOT (Texas)
Plant ID66341
ISO / marketERCOT (Texas)
Balancing authorityElectric Reliability Council of Texas, Inc.