Query
Eagle Point Energy Center
Type
Entity Briefing
Entity
Eagle Point Energy Center
Generated
2026-10-17T08:37:35.582Z

Briefing on Eagle Point Energy Center

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
25 MW
Capacity
Operating
Current status
1987
Operating since
1
Generators
0.0%
Capacity factor
0 GWh
Annual generation
Briefing/plantOperating

Eagle Point Energy Center is a 25 MW Municipal Solid Waste asset in ISO New England, currently Operating.

Eagle Point Energy Center is reported in Maine since 1987 under Town of Orrington. Available operating and financial measures include 0.0% capacity factor and 0 GWh annual generation; $3495/kW reported CapEx.

Location
Penobscot, Maine
Technology
Municipal Solid Waste
Owner / parent
Town of Orrington
Operator
Eagle Point Energy Center, LLC
Grid
ISO New England
Plant ID
50051

What stands out

1

Eagle Point Energy Center is a 25 MW Municipal Solid Waste asset in Maine with status Operating.

2

Latest annual operating measures report 0.0% capacity factor and 0 GWh annual generation.

3

Available financial measures include $3495/kW CapEx.

4

Latest linked story: “Orrington says trash incinerator owes nearly $186K in taxes” (Bangor Daily News, 2025-08-26).

Market and operating context

ISO / market
ISO New England
Balancing authority
ISO New England Inc.
NERC region
NPCC
State rank
#1 of 3
National rank
#34 of 55

Why it matters

For this asset in ISO New England, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.