Query
Dynegy Moss Landing Power Plant Hybrid
Type
Entity Briefing
Entity
Dynegy Moss Landing Power Plant Hybrid
State
MA
Technology
hybrid
Generated
2026-10-17T09:43:48.194Z

Briefing on Dynegy Moss Landing Power Plant Hybrid

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
1.8 GW
Capacity
Operating
Current status
2002
Operating since
8
Generators
11.0%
Capacity factor
2068 GWh
Annual generation
Briefing/plantOperating

Dynegy Moss Landing Power Plant Hybrid is a 1.8 GW Batteries asset in CAISO (California), currently Operating.

Dynegy Moss Landing Power Plant Hybrid is reported in California since 2002 under Vistra. Available operating and financial measures include 11.0% capacity factor and 2068 GWh annual generation; $913/kW reported CapEx.

Location
Monterey, California
Technology
Batteries, Natural Gas Fired Combined Cycle
Owner / parent
Vistra
Operator
Dynegy -Moss Landing LLC
Grid
CAISO (California)
Plant ID
260

What stands out

1

Dynegy Moss Landing Power Plant Hybrid is a 1.8 GW Batteries asset in California with status Operating.

2

Latest annual operating measures report 11.0% capacity factor and 2068 GWh annual generation.

3

Available financial measures include $913/kW CapEx.

4

Latest linked story: “Vistra Completes Expansion of Battery Energy Storage System at Its Flagship California Facility” (CSRwire, 2026-03-09).

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#1 of 303
National rank
#32 of 2,025

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.