Query
Dunlap
Type
Entity Briefing
Entity
Dunlap
Summary generated
Oct 10, 2026
First saved
Date not recorded

Briefing on Dunlap

Entity Briefing

Summary generated Oct 10, 2026 (UTC).

Source dates used by this summary were not recorded.

130 MW
Capacity
Operating
Current status
2010
Operating since
1
Generators
32.2%
Capacity factor
366 GWh
Annual generation
Briefing/plantOperating

Dunlap is a 130 MW Onshore Wind Turbine asset in Wyoming, currently Operating.

Dunlap is reported in Wyoming since 2010 under Berkshire Hathaway. Available operating and financial measures include 32.2% capacity factor and 366 GWh annual generation.

Location
Carbon, Wyoming
Technology
Onshore Wind Turbine
Owner / parent
Berkshire Hathaway
Operator
PacifiCorp
Grid
PacifiCorp - East
Plant ID
57299

What stands out

1

Dunlap is a 130 MW Onshore Wind Turbine asset in Wyoming with status Operating.

2

Latest annual operating measures report 32.2% capacity factor and 366 GWh annual generation.

Market and operating context

Balancing authority
PacifiCorp - East
NERC region
WECC
State rank
#17 of 31
National rank
#602 of 1,442

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.