Query
Drill Baby Drill BESS
Type
Entity Briefing
Entity
Drill Baby Drill BESS
State
TN
Technology
battery
Generated
2026-10-19T20:15:34.446Z

Briefing on Drill Baby Drill BESS

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
204 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-10-11
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Drill Baby Drill BESS is a 204 MW Battery project in Texas, currently active.

SBESS TX8 LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-10-11.

Queue ID
ERCOT-27INR0290
Location
Midland, Texas
Technology
Battery
Developer
SBESS TX8 LLC
Market / region
ERCOT
Point of interconnection
23859 SALTFLAT 138KV

What stands out

1

Drill Baby Drill BESS is a 204 MW Battery project in Texas with status active.

2

SBESS TX8 LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-10-11.

Market and operating context

Queue date
2024-09-04
Proposed COD
2028-10-11
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Drill Baby Drill BESS — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0290
LocationMidland, Texas
TechnologyBattery
DeveloperSBESS TX8 LLC
Market / regionERCOT
Point of interconnection23859 SALTFLAT 138KV
Queue date2024-09-04
Proposed COD2028-10-11