Briefing/projectactive
Drill Baby Drill BESS is a 204 MW Battery project in Texas, currently active.
SBESS TX8 LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-10-11.
- Queue ID
- ERCOT-27INR0290
- Location
- Midland, Texas
- Technology
- Battery
- Developer
- SBESS TX8 LLC
- Market / region
- ERCOT
- Point of interconnection
- 23859 SALTFLAT 138KV
What stands out
1
Drill Baby Drill BESS is a 204 MW Battery project in Texas with status active.
2
SBESS TX8 LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-10-11.
Market and operating context
- Queue date
- 2024-09-04
- Proposed COD
- 2028-10-11
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.