Query
Driet BESS
Type
Entity Briefing
Entity
Driet BESS
State
TN
Technology
battery
Generated
2026-10-19T23:26:32.103Z

Briefing on Driet BESS

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
151 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-06-20
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Driet BESS is a 151 MW Battery project in Texas, currently active.

Driet BESS LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-06-20.

Queue ID
ERCOT-25INR0402
Location
Colorado, Texas
Technology
Battery
Developer
Driet BESS LLC
Market / region
ERCOT
Point of interconnection
7254 WEIMAR8 138kV

What stands out

1

Driet BESS is a 151 MW Battery project in Texas with status active.

2

Driet BESS LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-06-20.

4

Latest linked story: “Orrick Advises ENGIE on Partnership with CBRE for 2.4 GW Battery Storage Portfolio” (Orrick, 2025-05-19).

Market and operating context

Queue date
2023-06-07
Proposed COD
2028-06-20
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Driet BESS — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0402
LocationColorado, Texas
TechnologyBattery
DeveloperDriet BESS LLC
Market / regionERCOT
Point of interconnection7254 WEIMAR8 138kV
Queue date2023-06-07
Proposed COD2028-06-20