Driet BESS is a 151 MW Battery project in Texas, currently active.
Driet BESS LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-06-20.
- Queue ID
- ERCOT-25INR0402
- Location
- Colorado, Texas
- Technology
- Battery
- Developer
- Driet BESS LLC
- Market / region
- ERCOT
- Point of interconnection
- 7254 WEIMAR8 138kV
What stands out
1
Driet BESS is a 151 MW Battery project in Texas with status active.
2
Driet BESS LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-06-20.
4
Latest linked story: “Orrick Advises ENGIE on Partnership with CBRE for 2.4 GW Battery Storage Portfolio” (Orrick, 2025-05-19).
Market and operating context
- Queue date
- 2023-06-07
- Proposed COD
- 2028-06-20
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.