Briefing on Drake BESS

Entity Briefing
Generated Oct 6, 2026·Dataset freshness not reported
257 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-01-29
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Drake BESS is a 257 MW Battery project in Texas, currently active.

Mallard Energy Storage LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2027-01-29.

Queue ID
ERCOT-25INR0101
Location
Collin, Texas
Technology
Battery
Developer
Mallard Energy Storage LLC
Market / region
ERCOT
Point of interconnection
#833 Wylie Switch 138kV

What stands out

1

Drake BESS is a 257 MW Battery project in Texas with status active.

2

Mallard Energy Storage LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2027-01-29.

Market and operating context

Queue date
2022-06-02
Proposed COD
2027-01-29
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Drake BESS — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0101
LocationCollin, Texas
TechnologyBattery
DeveloperMallard Energy Storage LLC
Market / regionERCOT
Point of interconnection#833 Wylie Switch 138kV
Queue date2022-06-02
Proposed COD2027-01-29