Briefing/projectactive
Downtown BESS is a 10 MW Battery project in Texas, currently active.
Fort Stockton Clean Energy Center, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-01-30.
- Queue ID
- ERCOT-25INR0764
- Location
- Pecos, Texas
- Technology
- Battery
- Developer
- Fort Stockton Clean Energy Center, LLC
- Market / region
- ERCOT
- Point of interconnection
- New DESR on the coordinates above tie at 12.47kV to: TSP Station Name: Downtown TSP Station Code: TNFS Load Name: LOAD2 Bus #: PTI Bus Number: 38360 Voltage (Transmission level kV): 69kV Node (load/load XFMR in NMMS): 0007
What stands out
1
Downtown BESS is a 10 MW Battery project in Texas with status active.
2
Fort Stockton Clean Energy Center, LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2026-01-30.
Market and operating context
- Proposed COD
- 2026-01-30
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.