Query
DOUBLE SPRINGS ENERGY STORAGE
Type
Entity Briefing
Entity
DOUBLE SPRINGS ENERGY STORAGE
Technology
battery
Generated
2026-10-12T02:02:53.593Z

Briefing on DOUBLE SPRINGS ENERGY STORAGE

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
101 MW
Proposed capacity
active
Current status
Battery
Technology
CAISO
Market / region
2029-08-17
Proposed COD
C14
Queue phase
Briefing/projectactive

DOUBLE SPRINGS ENERGY STORAGE is a 101 MW Battery project in California, currently active.

The reported queue phase is C14. Proposed COD is 2029-08-17.

Queue ID
CAISO-1876
Location
Calaveras, California
Technology
Battery
Market / region
CAISO
Point of interconnection
Valley Springs 60 kV

What stands out

1

DOUBLE SPRINGS ENERGY STORAGE is a 101 MW Battery project in California with status active.

2

The reported queue phase is C14; proposed COD is 2029-08-17.

Market and operating context

Queue date
2021-04-15
Proposed COD
2029-08-17
IA status
IA Executed
Study phase
C14
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

DOUBLE SPRINGS ENERGY STORAGE — verified asset snapshot

FieldValue
Queue IDCAISO-1876
LocationCalaveras, California
TechnologyBattery
Market / regionCAISO
Point of interconnectionValley Springs 60 kV
Queue date2021-04-15
Proposed COD2029-08-17
IA statusIA Executed