Double A Solar SLF is a 133 MW Solar+Battery project in Texas, currently active.
Double A Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-05-31.
- Queue ID
- ERCOT-27INR0248
- Location
- Goliad, Texas
- Technology
- Solar+Battery
- Developer
- Double A Solar, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 69kV 5678 Schroeder - 5675 Big Oak
What stands out
1
Double A Solar SLF is a 133 MW Solar+Battery project in Texas with status active.
2
Double A Solar, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2027-05-31.
Market and operating context
- Queue date
- 2024-06-13
- Proposed COD
- 2027-05-31
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.