Double A Solar SLF
Type
Entity Briefing
Entity
Double A Solar SLF
Generated
2026-10-05T07:44:27.414Z

Briefing on Double A Solar SLF

Entity Briefing
Generated Oct 5, 2026·Dataset freshness not reported
133 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2027-05-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Double A Solar SLF is a 133 MW Solar+Battery project in Texas, currently active.

Double A Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-05-31.

Queue ID
ERCOT-27INR0248
Location
Goliad, Texas
Technology
Solar+Battery
Developer
Double A Solar, LLC
Market / region
ERCOT
Point of interconnection
Tap 69kV 5678 Schroeder - 5675 Big Oak

What stands out

1

Double A Solar SLF is a 133 MW Solar+Battery project in Texas with status active.

2

Double A Solar, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-05-31.

Market and operating context

Queue date
2024-06-13
Proposed COD
2027-05-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Double A Solar SLF — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0248
LocationGoliad, Texas
TechnologySolar+Battery
DeveloperDouble A Solar, LLC
Market / regionERCOT
Point of interconnectionTap 69kV 5678 Schroeder - 5675 Big Oak
Queue date2024-06-13
Proposed COD2027-05-31