Query
Dorsey Road BESS
Type
Entity Briefing
Entity
Dorsey Road BESS
State
CO
Technology
battery
Generated
2026-10-19T12:39:12.350Z

Briefing on Dorsey Road BESS

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
155 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2029-08-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Dorsey Road BESS is a 155 MW Battery project in Texas, currently active.

Horizon Energy Storage Greenfield Project Holdings LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-08-31.

Queue ID
ERCOT-27INR0342
Location
Bexar, Texas
Technology
Battery
Developer
Horizon Energy Storage Greenfield Project Holdings LLC
Market / region
ERCOT
Point of interconnection
Tap 138 kV Chavanea (5085) - Palo Alto (5330).

What stands out

1

Dorsey Road BESS is a 155 MW Battery project in Texas with status active.

2

Horizon Energy Storage Greenfield Project Holdings LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-08-31.

Market and operating context

Queue date
2025-03-06
Proposed COD
2029-08-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Dorsey Road BESS — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0342
LocationBexar, Texas
TechnologyBattery
DeveloperHorizon Energy Storage Greenfield Project Holdings LLC
Market / regionERCOT
Point of interconnectionTap 138 kV Chavanea (5085) - Palo Alto (5330).
Queue date2025-03-06
Proposed COD2029-08-31