Briefing/projectactive
Donelson Solar SLF is a 75 MW Solar+Battery project in Texas, currently active.
Donelson Solar is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-10-17.
- Queue ID
- ERCOT-27INR0292
- Location
- Red River, Texas
- Technology
- Solar+Battery
- Developer
- Donelson Solar
- Market / region
- ERCOT
- Point of interconnection
- Tap the 69 kV Bagwell (#1785) - Clarksville (#11784) line, ONCOR
What stands out
1
Donelson Solar SLF is a 75 MW Solar+Battery project in Texas with status active.
2
Donelson Solar is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-10-17.
Market and operating context
- Queue date
- 2025-03-24
- Proposed COD
- 2028-10-17
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.