Query
Dolores Canyon Solar
Type
Entity Briefing
Entity
Dolores Canyon Solar
Generated
2026-10-17T07:46:41.701Z

Briefing on Dolores Canyon Solar

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
110 MW
Capacity
Operating
Current status
2025
Operating since
1
Generators
Briefing/plantOperating

Dolores Canyon Solar is a 110 MW Solar Photovoltaic asset in Colorado, currently Operating.

Dolores Canyon Solar is reported in Colorado since 2025 under Tri-State G & T Assn, Inc. Available operating and financial measures include $1544/kW reported CapEx.

Location
Dolores, Colorado
Technology
Solar Photovoltaic
Owner / parent
Tri-State G & T Assn, Inc
Operator
Tri-State G & T Assn, Inc
Grid
Western Area Power Administration - Rocky Mountain Region
Plant ID
64858

What stands out

1

Dolores Canyon Solar is a 110 MW Solar Photovoltaic asset in Colorado with status Operating.

2

Available financial measures include $1544/kW CapEx.

3

Latest linked story: “Tri-State buys Moffat, Dolores county solar projects” (The Grand Junction Daily Sentinel, 2024-06-09).

Market and operating context

Balancing authority
Western Area Power Administration - Rocky Mountain Region
NERC region
WECC
State rank
#19 of 191
National rank
#754 of 7,971

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Dolores Canyon Solar — verified asset snapshot

FieldValue
LocationDolores, Colorado
TechnologySolar Photovoltaic
Owner / parentTri-State G & T Assn, Inc
OperatorTri-State G & T Assn, Inc
GridWestern Area Power Administration - Rocky Mountain Region
Plant ID64858
Balancing authorityWestern Area Power Administration - Rocky Mountain Region
NERC regionWECC