Query
Dolomite Storage
Type
Entity Briefing
Entity
Dolomite Storage
Generated
2026-10-19T17:29:23.777Z

Briefing on Dolomite Storage

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
126 MW
Capacity
Planned
Current status
1
Generators
Briefing/plantPlanned

Dolomite Storage is a 126 MW Batteries asset in ERCOT (Texas), currently Planned.

Dolomite Storage is reported in Texas under Belltown Power Texas 2, LLC. Available operating and financial measures include $1361/kW reported CapEx.

Location
Ellis, Texas
Technology
Batteries
Owner / parent
Belltown Power Texas 2, LLC
Operator
Belltown Power Texas 2, LLC
Grid
ERCOT (Texas)
Plant ID
68166

What stands out

1

Dolomite Storage is a 126 MW Batteries asset in Texas with status Planned.

2

Available financial measures include $1361/kW CapEx.

3

1 linked queue projects represent 126 MW of proposed capacity.

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#138 of 344
National rank
#309 of 994

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Dolomite Storage — verified asset snapshot

FieldValue
LocationEllis, Texas
TechnologyBatteries
Owner / parentBelltown Power Texas 2, LLC
OperatorBelltown Power Texas 2, LLC
GridERCOT (Texas)
Plant ID68166
ISO / marketERCOT (Texas)
Balancing authorityElectric Reliability Council of Texas, Inc.