Briefing/projectactive
Dog Star Solar I is a 503 MW Solar project in Texas, currently active.
Dog Star Solar LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-12-31.
- Queue ID
- ERCOT-27INR0503
- Location
- Taylor, Texas
- Technology
- Solar
- Developer
- Dog Star Solar LLC
- Market / region
- ERCOT
- Point of interconnection
- 6235 ABILENE MULBERRY CREEK 345 kV
What stands out
1
Dog Star Solar I is a 503 MW Solar project in Texas with status active.
2
Dog Star Solar LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2027-12-31.
Market and operating context
- Queue date
- 2025-07-07
- Proposed COD
- 2027-12-31
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.