Briefing/plantOperating
Division 2 is a 1 MW Solar Photovoltaic asset in CAISO (California), currently Operating.
Division 2 is reported in California since 2014 under Tesla Inc.. Available operating and financial measures include 6.1% capacity factor and 1 GWh annual generation; $8.4/MWh reported energy value.
- Location
- Los Angeles, California
- Technology
- Solar Photovoltaic
- Owner / parent
- Tesla Inc.
- Operator
- Tesla Inc.
- Grid
- CAISO (California)
- Plant ID
- 59095
What stands out
1
Division 2 is a 1 MW Solar Photovoltaic asset in California with status Operating.
2
Latest annual operating measures report 6.1% capacity factor and 1 GWh annual generation.
3
Available financial measures include $8.4/MWh energy value.
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #971 of 992
- National rank
- #7245 of 7,971
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.