Briefing on Diamond Sage BESS 1

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
100 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-10-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Diamond Sage BESS 1 is a 100 MW Solar+Battery project in Texas, currently active.

DGC Renewables, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-10-01.

Queue ID
ERCOT-27INR0414
Location
Webb, Texas
Technology
Solar+Battery
Developer
DGC Renewables, LLC
Market / region
ERCOT
Point of interconnection
tap 345kV 80219 LOBO7A - 5709 FOWLERTONSW5 CKT2

What stands out

1

Diamond Sage BESS 1 is a 100 MW Solar+Battery project in Texas with status active.

2

DGC Renewables, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-10-01.

Market and operating context

Queue date
2025-01-28
Proposed COD
2028-10-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Diamond Sage BESS 1 — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0414
LocationWebb, Texas
TechnologySolar+Battery
DeveloperDGC Renewables, LLC
Market / regionERCOT
Point of interconnectiontap 345kV 80219 LOBO7A - 5709 FOWLERTONSW5 CKT2
Queue date2025-01-28
Proposed COD2028-10-01