Query
Diablo Campo Storage
Type
Entity Briefing
Entity
Diablo Campo Storage
Generated
2026-10-20T02:47:22.970Z

Briefing on Diablo Campo Storage

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
314 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2029-09-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Diablo Campo Storage is a 314 MW Battery project in Texas, currently active.

Diablo Campo Energy Center, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-09-30.

Queue ID
ERCOT-27INR0149
Location
Goliad, Texas
Technology
Battery
Developer
Diablo Campo Energy Center, LLC
Market / region
ERCOT
Point of interconnection
The Coleto Greek (#8164) to Pawnee Switching Station (#5725) ; LCRA

What stands out

1

Diablo Campo Storage is a 314 MW Battery project in Texas with status active.

2

Diablo Campo Energy Center, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-09-30.

Market and operating context

Queue date
2024-02-07
Proposed COD
2029-09-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Diablo Campo Storage — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0149
LocationGoliad, Texas
TechnologyBattery
DeveloperDiablo Campo Energy Center, LLC
Market / regionERCOT
Point of interconnectionThe Coleto Greek (#8164) to Pawnee Switching Station (#5725) ; LCRA
Queue date2024-02-07
Proposed COD2029-09-30