Query
DESI-2 Battery Storage Facility
Type
Entity Briefing
Entity
DESI-2 Battery Storage Facility
Technology
battery
Generated
2026-10-18T02:23:56.275Z

Briefing on DESI-2 Battery Storage Facility

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
1 MW
Capacity
Operating
Current status
2019
Operating since
1
Generators
0.0%
Capacity factor
0 GWh
Annual generation
Briefing/plantOperating

DESI-2 Battery Storage Facility is a 1 MW Batteries asset in CAISO (California), currently Operating.

DESI-2 Battery Storage Facility is reported in California since 2019 under Edison International. Available operating and financial measures include 0.0% capacity factor and 0 GWh annual generation; $2973/kW reported CapEx.

Location
Orange, California
Technology
Batteries
Owner / parent
Edison International
Operator
Southern California Edison Co
Grid
CAISO (California)
Plant ID
62460

What stands out

1

DESI-2 Battery Storage Facility is a 1 MW Batteries asset in California with status Operating.

2

Latest annual operating measures report 0.0% capacity factor and 0 GWh annual generation.

3

Available financial measures include $2973/kW CapEx.

4

Latest linked story: “Ameresco to get 2.1GWh BESS project for Southern California Edison to ‘substantial completion by summer’” (Energy-Storage.News, 2023-03-01).

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#192 of 202
National rank
#969 of 994

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.