Briefing on Dempsey Solar SLF

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
245 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-09-08
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Dempsey Solar SLF is a 245 MW Solar+Battery project in Texas, currently active.

Dempsey Solar LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-09-08.

Queue ID
ERCOT-26INR0632
Location
Leon, Texas
Technology
Solar+Battery
Developer
Dempsey Solar LLC
Market / region
ERCOT
Point of interconnection
Tap 138 KV Ridge (#37)-Robertson (#32) line; BEPC

What stands out

1

Dempsey Solar SLF is a 245 MW Solar+Battery project in Texas with status active.

2

Dempsey Solar LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-09-08.

Market and operating context

Queue date
2025-02-25
Proposed COD
2028-09-08
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Dempsey Solar SLF — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0632
LocationLeon, Texas
TechnologySolar+Battery
DeveloperDempsey Solar LLC
Market / regionERCOT
Point of interconnectionTap 138 KV Ridge (#37)-Robertson (#32) line; BEPC
Queue date2025-02-25
Proposed COD2028-09-08