Query
Delta Solar Power I
Type
Entity Briefing
Entity
Triangle Ranch Delta
State
DE
Summary generated
Oct 10, 2026
First saved
Date not recorded

Briefing on Triangle Ranch Delta

Entity Briefing

Summary generated Oct 10, 2026 (UTC).

Source dates used by this summary were not recorded.

102 MW
Proposed capacity
suspended
Current status
Wind
Technology
ERCOT
Market / region
2025-08-30
Proposed COD
Briefing/projectsuspended

Triangle Ranch Delta is a 102 MW Wind project in Texas, currently suspended.

Proposed COD is 2025-08-30.

Queue ID
ERCOT-25INR0180
Location
Cottle, Texas
Technology
Wind
Market / region
ERCOT

What stands out

1

Triangle Ranch Delta is a 102 MW Wind project in Texas with status suspended.

2

proposed COD is 2025-08-30.

Market and operating context

Queue date
2022-09-14
Proposed COD
2025-08-30

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Triangle Ranch Delta — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0180
LocationCottle, Texas
TechnologyWind
Market / regionERCOT
Queue date2022-09-14
Proposed COD2025-08-30