Briefing/projectsuspended
Triangle Ranch Delta is a 102 MW Wind project in Texas, currently suspended.
Proposed COD is 2025-08-30.
- Queue ID
- ERCOT-25INR0180
- Location
- Cottle, Texas
- Technology
- Wind
- Market / region
- ERCOT
What stands out
1
Triangle Ranch Delta is a 102 MW Wind project in Texas with status suspended.
2
proposed COD is 2025-08-30.
Market and operating context
- Queue date
- 2022-09-14
- Proposed COD
- 2025-08-30
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.