Query
Deer Rips
Type
Entity Briefing
Entity
Deer Rips
Generated
2026-10-18T01:29:22.529Z

Briefing on Deer Rips

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
7 MW
Capacity
Operating
Current status
1903
Operating since
7
Generators
84.2%
Capacity factor
58 GWh
Annual generation
Briefing/plantOperating

Deer Rips is a 7 MW Conventional Hydroelectric asset in ISO New England, currently Operating.

Deer Rips is reported in Maine since 1903 under Brookfield White Pine Hydro LLC. Available operating and financial measures include 84.2% capacity factor and 58 GWh annual generation; $2294/kW reported CapEx.

Location
Androscoggin, Maine
Technology
Conventional Hydroelectric
Owner / parent
Brookfield White Pine Hydro LLC
Operator
Brookfield White Pine Hydro LLC
Grid
ISO New England
Plant ID
1488

What stands out

1

Deer Rips is a 7 MW Conventional Hydroelectric asset in Maine with status Operating.

2

Latest annual operating measures report 84.2% capacity factor and 58 GWh annual generation.

3

Available financial measures include $2294/kW CapEx.

Market and operating context

ISO / market
ISO New England
Balancing authority
ISO New England Inc.
NERC region
NPCC
State rank
#27 of 48
National rank
#789 of 1,462

Why it matters

For this asset in ISO New England, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.