Briefing on Danville VA BESS 2

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
11 MW
Capacity
Under construction
Current status
1
Generators
Briefing/plantUnder construction

Danville VA BESS 2 is a 11 MW Batteries asset in PJM Interconnection, currently Under construction.

Danville VA BESS 2 is reported in Virginia under Danville VA BESS 2 LLC. Available operating and financial measures include $1361/kW reported CapEx.

Location
Pittsylvania, Virginia
Technology
Batteries
Owner / parent
Danville VA BESS 2 LLC
Operator
Danville VA BESS 2 LLC
Grid
PJM Interconnection
Plant ID
69552

What stands out

1

Danville VA BESS 2 is a 11 MW Batteries asset in Virginia with status Under construction.

2

Available financial measures include $1361/kW CapEx.

Market and operating context

ISO / market
PJM Interconnection
State rank
#4 of 6
National rank
#577 of 994

Why it matters

For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Danville VA BESS 2 — verified asset snapshot

FieldValue
LocationPittsylvania, Virginia
TechnologyBatteries
Owner / parentDanville VA BESS 2 LLC
OperatorDanville VA BESS 2 LLC
GridPJM Interconnection
Plant ID69552
ISO / marketPJM Interconnection
State rank#4 of 6