Briefing on DAMON BESS3

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
10 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2025-12-01
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

DAMON BESS3 is a 10 MW Battery project in Texas, currently active.

BarBar Storage LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2025-12-01.

Queue ID
ERCOT-23INR0790
Location
Brazoria, Texas
Technology
Battery
Developer
BarBar Storage LLC
Market / region
ERCOT
Point of interconnection
Station Name: DAMON TSP Station Code: DA Load/Load Transformer Name: TR2 PTI BUS number: 42370 Voltage in kV (Transmission Level): 138 kV Node (associated w/ load/load XFRM in NMMS): TR2

What stands out

1

DAMON BESS3 is a 10 MW Battery project in Texas with status active.

2

BarBar Storage LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2025-12-01.

Market and operating context

Proposed COD
2025-12-01
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

DAMON BESS3 — verified asset snapshot

FieldValue
Queue IDERCOT-23INR0790
LocationBrazoria, Texas
TechnologyBattery
DeveloperBarBar Storage LLC
Market / regionERCOT
Point of interconnectionStation Name: DAMON TSP Station Code: DA Load/Load Transformer Name: TR2 PTI BUS number: 42370 Voltage in kV (Transmission Level): 138 kV Node (associated w/ load/load XFRM in NMMS): TR2
Proposed COD2025-12-01
IA statusIA Executed