Briefing/projectactive
DAMON BESS3 is a 10 MW Battery project in Texas, currently active.
BarBar Storage LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2025-12-01.
- Queue ID
- ERCOT-23INR0790
- Location
- Brazoria, Texas
- Technology
- Battery
- Developer
- BarBar Storage LLC
- Market / region
- ERCOT
- Point of interconnection
- Station Name: DAMON TSP Station Code: DA Load/Load Transformer Name: TR2 PTI BUS number: 42370 Voltage in kV (Transmission Level): 138 kV Node (associated w/ load/load XFRM in NMMS): TR2
What stands out
1
DAMON BESS3 is a 10 MW Battery project in Texas with status active.
2
BarBar Storage LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2025-12-01.
Market and operating context
- Proposed COD
- 2025-12-01
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.