Query
Damon BESS 2
Type
Entity Briefing
Entity
Damon BESS 2
State
TN
Technology
battery
Generated
2026-10-19T05:13:29.419Z

Briefing on Damon BESS 2

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
10 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2026-08-21
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Damon BESS 2 is a 10 MW Battery project in Texas, currently active.

PR DAMON, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-08-21.

Queue ID
ERCOT-23INR0603
Location
Brazoria, Texas
Technology
Battery
Developer
PR DAMON, LLC
Market / region
ERCOT
Point of interconnection
9.99 MW 50 MWh battery energy storage project connecting at 12.47kV Damon (DA) substation. Station Name (TDSP Station Code): DA Load/Load Transformer Name: TR2 PTI BUS number: 42370 Voltage in kV (Transmission Level): 138 kV

What stands out

1

Damon BESS 2 is a 10 MW Battery project in Texas with status active.

2

PR DAMON, LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2026-08-21.

Market and operating context

Queue date
2023-05-17
Proposed COD
2026-08-21
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Damon BESS 2 — verified asset snapshot

FieldValue
Queue IDERCOT-23INR0603
LocationBrazoria, Texas
TechnologyBattery
DeveloperPR DAMON, LLC
Market / regionERCOT
Point of interconnection9.99 MW 50 MWh battery energy storage project connecting at 12.47kV Damon (DA) substation. Station Name (TDSP Station Code): DA Load/Load Transformer Name: TR2 PTI BUS number: 42370 Voltage in kV (Transmission Level): 138 kV
Queue date2023-05-17
Proposed COD2026-08-21