Briefing/projectactive
Damon BESS 2 is a 10 MW Battery project in Texas, currently active.
PR DAMON, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-08-21.
- Queue ID
- ERCOT-23INR0603
- Location
- Brazoria, Texas
- Technology
- Battery
- Developer
- PR DAMON, LLC
- Market / region
- ERCOT
- Point of interconnection
- 9.99 MW 50 MWh battery energy storage project connecting at 12.47kV Damon (DA) substation. Station Name (TDSP Station Code): DA Load/Load Transformer Name: TR2 PTI BUS number: 42370 Voltage in kV (Transmission Level): 138 kV
What stands out
1
Damon BESS 2 is a 10 MW Battery project in Texas with status active.
2
PR DAMON, LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2026-08-21.
Market and operating context
- Queue date
- 2023-05-17
- Proposed COD
- 2026-08-21
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.