Query
Daggett 3
Type
Entity Briefing
Entity
Daggett 3
Generated
2026-10-19T11:47:29.781Z

Briefing on Daggett 3

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
449 MW
Capacity
Operating
Current status
2023
Operating since
2
Generators
22.0%
Capacity factor
866 GWh
Annual generation
Briefing/plantOperating

Daggett 3 is a 449 MW Batteries asset in CAISO (California), currently Operating.

Daggett 3 is reported in California since 2023 under Clearway Energy. Available operating and financial measures include 22.0% capacity factor and 866 GWh annual generation.

Location
San Bernardino, California
Technology
Batteries, Solar Photovoltaic
Owner / parent
Clearway Energy
Operator
Daggett Solar Power 3 LLC
Grid
CAISO (California)
Plant ID
64852

What stands out

1

Daggett 3 is a 449 MW Batteries asset in California with status Operating.

2

Latest annual operating measures report 22.0% capacity factor and 866 GWh annual generation.

3

Latest linked story: “Clearway Energy, Inc. Seeks Shareholder Approval at Annual Meeting to Simplify Public Share Class Structure” (Investing News Network, 2026-03-09).

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#14 of 992
National rank
#67 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.