Briefing/plantOperating
Cuyahoga Generating Facility is a 3 MW Landfill Gas asset in PJM Interconnection, currently Operating.
Cuyahoga Generating Facility is reported in Ohio since 2025 under Northeastern Power Systems. Available operating and financial measures include $2592/kW reported CapEx.
- Location
- Cuyahoga, Ohio
- Technology
- Landfill Gas
- Owner / parent
- Northeastern Power Systems
- Operator
- Northeastern Power Systems
- Grid
- PJM Interconnection
- Plant ID
- 69146
What stands out
1
Cuyahoga Generating Facility is a 3 MW Landfill Gas asset in Ohio with status Operating.
2
Available financial measures include $2592/kW CapEx.
Market and operating context
- ISO / market
- PJM Interconnection
- State rank
- #7 of 8
- National rank
- #182 of 282
Why it matters
For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.