Cutlass Solar II is a 203 MW Solar Photovoltaic asset in ERCOT (Texas), currently Operating.
Cutlass Solar II is reported in Texas since 2024 under Cutlass II Solar LLC. Available operating and financial measures include 23.5% capacity factor and 418 GWh annual generation.
- Location
- Fort Bend, Texas
- Technology
- Solar Photovoltaic
- Owner / parent
- Cutlass II Solar LLC
- Operator
- Cutlass II Solar LLC
- Grid
- ERCOT (Texas)
- Plant ID
- 66262
What stands out
Cutlass Solar II is a 203 MW Solar Photovoltaic asset in Texas with status Operating.
Latest annual operating measures report 23.5% capacity factor and 418 GWh annual generation.
Latest linked story: “Meta data center PPA spurs another 220 MW of Texas solar” (Solar Power World, 2026-07-04).
Market and operating context
- ISO / market
- ERCOT (Texas)
- Balancing authority
- Electric Reliability Council of Texas, Inc.
- NERC region
- TRE
- State rank
- #143 of 378
- National rank
- #345 of 7,971
Why it matters
For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.