Custer Energy Center is a 25 MW Natural Gas Fired Combustion Turbine asset in MISO (Midcontinent), currently Operating.
Custer Energy Center is reported in Wisconsin since 1999 under Manitowoc Public Utilities. Available operating and financial measures include 2.6% capacity factor and 6 GWh annual generation; $965/kW reported CapEx.
- Location
- Manitowoc, Wisconsin
- Technology
- Natural Gas Fired Combustion Turbine
- Owner / parent
- Manitowoc Public Utilities
- Operator
- Manitowoc Public Utilities
- Grid
- MISO (Midcontinent)
- Plant ID
- 7795
What stands out
Custer Energy Center is a 25 MW Natural Gas Fired Combustion Turbine asset in Wisconsin with status Operating.
Latest annual operating measures report 2.6% capacity factor and 6 GWh annual generation.
Available financial measures include $965/kW CapEx.
Market and operating context
- ISO / market
- MISO (Midcontinent)
- Balancing authority
- Midcontinent Independent Transmission System Operator, Inc..
- NERC region
- MRO
- State rank
- #34 of 41
- National rank
- #1317 of 2,025
Why it matters
For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.