Briefing on Cuchillas Solar

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
306 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-12-15
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Cuchillas Solar is a 306 MW Solar+Battery project in Texas, currently active.

Gransolar Texas Two, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-12-15.

Queue ID
ERCOT-24INR0059
Location
Webb, Texas
Technology
Solar+Battery
Developer
Gransolar Texas Two, LLC
Market / region
ERCOT
Point of interconnection
80219 Lobo 345kV

What stands out

1

Cuchillas Solar is a 306 MW Solar+Battery project in Texas with status active.

2

Gransolar Texas Two, LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2028-12-15.

Market and operating context

Queue date
2021-06-02
Proposed COD
2028-12-15
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Cuchillas Solar — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0059
LocationWebb, Texas
TechnologySolar+Battery
DeveloperGransolar Texas Two, LLC
Market / regionERCOT
Point of interconnection80219 Lobo 345kV
Queue date2021-06-02
Proposed COD2028-12-15