Query
Cuchillas BESS
Type
Entity Briefing
Entity
Cuchillas BESS
State
TN
Technology
battery
Generated
2026-10-19T05:25:42.057Z

Briefing on Cuchillas BESS

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
307 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-12-15
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Cuchillas BESS is a 307 MW Solar+Battery project in Texas, currently active.

Gransolar Texas Two is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-12-15.

Queue ID
ERCOT-27INR0077
Location
Webb, Texas
Technology
Solar+Battery
Developer
Gransolar Texas Two
Market / region
ERCOT
Point of interconnection
80219 Lobo 345kV

What stands out

1

Cuchillas BESS is a 307 MW Solar+Battery project in Texas with status active.

2

Gransolar Texas Two is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-12-15.

Market and operating context

Queue date
2023-09-26
Proposed COD
2028-12-15
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Cuchillas BESS — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0077
LocationWebb, Texas
TechnologySolar+Battery
DeveloperGransolar Texas Two
Market / regionERCOT
Point of interconnection80219 Lobo 345kV
Queue date2023-09-26
Proposed COD2028-12-15