Briefing on CUA West Campus - South (CSG)

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
3 MW
Capacity
Operating
Current status
2024
Operating since
1
Generators
7.2%
Capacity factor
2 GWh
Annual generation
Briefing/plantOperating

CUA West Campus - South (CSG) is a 3 MW Solar Photovoltaic asset in PJM Interconnection, currently Operating.

CUA West Campus - South (CSG) is reported in District of Columbia since 2024 under Standard Solar. Available operating and financial measures include 7.2% capacity factor and 2 GWh annual generation; $1543/kW reported CapEx.

Location
District of Columbia, District of Columbia
Technology
Solar Photovoltaic
Owner / parent
Standard Solar
Operator
Standard Solar
Grid
PJM Interconnection
Plant ID
67707

What stands out

1

CUA West Campus - South (CSG) is a 3 MW Solar Photovoltaic asset in District of Columbia with status Operating.

2

Latest annual operating measures report 7.2% capacity factor and 2 GWh annual generation.

3

Available financial measures include $1543/kW CapEx.

Market and operating context

ISO / market
PJM Interconnection
Balancing authority
PJM Interconnection, LLC
NERC region
RFC
State rank
#5 of 17
National rank
#4800 of 7,971

Why it matters

For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.