Query
CSU Sacramento I
Type
Entity Briefing
Entity
Sacramento Municipal Util Dist
Generated
2026-10-09T10:33:29.493Z

Briefing on Sacramento Municipal Util Dist

Entity Briefing
Generated Oct 9, 2026·Dataset freshness not reported
7 MW
Capacity
Operating
Current status
1985
Operating since
1
Generators
11.8%
Capacity factor
7 GWh
Annual generation
Briefing/plantOperating

Sacramento Municipal Util Dist is a 7 MW Conventional Hydroelectric asset in CAISO (California), currently Operating.

Sacramento Municipal Util Dist is reported in California since 1985 under South Sutter Water District. Available operating and financial measures include 11.8% capacity factor and 7 GWh annual generation; $2294/kW reported CapEx.

Location
Placer, California
Technology
Conventional Hydroelectric
Owner / parent
South Sutter Water District
Operator
South Sutter Water District
Grid
CAISO (California)
Plant ID
531

What stands out

1

Sacramento Municipal Util Dist is a 7 MW Conventional Hydroelectric asset in California with status Operating.

2

Latest annual operating measures report 11.8% capacity factor and 7 GWh annual generation.

3

Available financial measures include $2294/kW CapEx.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#142 of 247
National rank
#763 of 1,462

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.