Query
CSU Sacramento I
Type
Entity Briefing
Entity
Sacramento Municipal Util Dist
Summary generated
Oct 17, 2026
First saved
Date not recorded

Briefing on Sacramento Municipal Util Dist

Entity Briefing

Summary generated Oct 17, 2026 (UTC).

Source dates used by this summary were not recorded.

7 MW
Capacity
Operating
Current status
1985
Operating since
1
Generators
11.8%
Capacity factor
7 GWh
Annual generation
Briefing/plantOperating

Sacramento Municipal Util Dist is a 7 MW Conventional Hydroelectric asset in CAISO (California), currently Operating.

Sacramento Municipal Util Dist is reported in California since 1985 under South Sutter Water District. Available operating and financial measures include 11.8% capacity factor and 7 GWh annual generation; $2294/kW reported CapEx.

Location
Placer, California
Technology
Conventional Hydroelectric
Owner / parent
South Sutter Water District
Operator
South Sutter Water District
Grid
CAISO (California)
Plant ID
531

What stands out

1

Sacramento Municipal Util Dist is a 7 MW Conventional Hydroelectric asset in California with status Operating.

2

Latest annual operating measures report 11.8% capacity factor and 7 GWh annual generation.

3

Available financial measures include $2294/kW CapEx.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#142 of 247
National rank
#763 of 1,462

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.