Sacramento Municipal Util Dist is a 7 MW Conventional Hydroelectric asset in CAISO (California), currently Operating.
Sacramento Municipal Util Dist is reported in California since 1985 under South Sutter Water District. Available operating and financial measures include 11.8% capacity factor and 7 GWh annual generation; $2294/kW reported CapEx.
- Location
- Placer, California
- Technology
- Conventional Hydroelectric
- Owner / parent
- South Sutter Water District
- Operator
- South Sutter Water District
- Grid
- CAISO (California)
- Plant ID
- 531
What stands out
Sacramento Municipal Util Dist is a 7 MW Conventional Hydroelectric asset in California with status Operating.
Latest annual operating measures report 11.8% capacity factor and 7 GWh annual generation.
Available financial measures include $2294/kW CapEx.
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #142 of 247
- National rank
- #763 of 1,462
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.