Crystal Lake 3 LLC is a 66 MW Onshore Wind Turbine asset in MISO (Midcontinent), currently Operating.
Crystal Lake 3 LLC is reported in Iowa since 2009 under NextEra Energy. Available operating and financial measures include 41.0% capacity factor and 237 GWh annual generation; $1895/kW reported CapEx.
- Location
- Winnebago, Iowa
- Technology
- Onshore Wind Turbine
- Owner / parent
- NextEra Energy
- Operator
- Crystal Lake 3 LLC
- Grid
- MISO (Midcontinent)
- Plant ID
- 57468
What stands out
Crystal Lake 3 LLC is a 66 MW Onshore Wind Turbine asset in Iowa with status Operating.
Latest annual operating measures report 41.0% capacity factor and 237 GWh annual generation.
Available financial measures include $1895/kW CapEx.
Latest linked story: “NextEra’s ‘game-changing’ Real Zero emissions goal spurs questions about hydrogen, demand-side management” (Utility Dive, 2022-08-03).
Market and operating context
- ISO / market
- MISO (Midcontinent)
- Balancing authority
- Midcontinent Independent Transmission System Operator, Inc..
- NERC region
- MRO
- State rank
- #68 of 123
- National rank
- #884 of 1,442
Why it matters
For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.