Query
Crosscut
Type
Entity Briefing
Entity
Crosscut
Generated
2026-10-12T12:57:49.957Z

Briefing on Crosscut

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
3 MW
Capacity
Out of service
Current status
1939
Operating since
1
Generators
Briefing/plantOut of service

Crosscut is a 3 MW Conventional Hydroelectric asset in Arizona, currently Out of service.

Crosscut is reported in Arizona since 1939 under Salt River Project. Available operating and financial measures include $2294/kW reported CapEx.

Location
Maricopa, Arizona
Technology
Conventional Hydroelectric
Owner / parent
Salt River Project
Operator
Salt River Project
Grid
Salt River Project
Plant ID
143

What stands out

1

Crosscut is a 3 MW Conventional Hydroelectric asset in Arizona with status Out of service.

2

Available financial measures include $2294/kW CapEx.

3

Latest linked story: “Google-backed CO2 battery firm Energy Dome to deploy 19MW system at SRP run power plant in Arizona” (Data Center Dynamics, 2026-06-20).

Market and operating context

Balancing authority
Salt River Project
NERC region
WECC
State rank
#10 of 11
National rank
#1076 of 1,462

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Crosscut — verified asset snapshot

FieldValue
LocationMaricopa, Arizona
TechnologyConventional Hydroelectric
Owner / parentSalt River Project
OperatorSalt River Project
GridSalt River Project
Plant ID143
Balancing authoritySalt River Project
NERC regionWECC