Query
Cross Trails Energy Storage Project
Type
Entity Briefing
Entity
Cross Trails Energy Storage Project
Technology
battery
Generated
2026-10-18T18:33:46.293Z

Briefing on Cross Trails Energy Storage Project

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
58 MW
Capacity
Operating
Current status
2025
Operating since
1
Generators
Briefing/plantOperating

Cross Trails Energy Storage Project is a 58 MW Batteries asset in ERCOT (Texas), currently Operating.

Cross Trails Energy Storage Project is reported in Texas since 2025 under Energy Vault, Inc.. Available operating and financial measures include $1361/kW reported CapEx.

Location
Scurry, Texas
Technology
Batteries
Owner / parent
Energy Vault, Inc.
Operator
Energy Vault, Inc.
Grid
ERCOT (Texas)
Plant ID
69244

What stands out

1

Cross Trails Energy Storage Project is a 58 MW Batteries asset in Texas with status Operating.

2

Available financial measures include $1361/kW CapEx.

Market and operating context

ISO / market
ERCOT (Texas)
State rank
#189 of 344
National rank
#443 of 994

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Cross Trails Energy Storage Project — verified asset snapshot

FieldValue
LocationScurry, Texas
TechnologyBatteries
Owner / parentEnergy Vault, Inc.
OperatorEnergy Vault, Inc.
GridERCOT (Texas)
Plant ID69244
ISO / marketERCOT (Texas)
State rank#189 of 344