Query
Crescent C BESS
Type
Entity Briefing
Entity
Crescent C BESS
State
TN
Technology
battery
Generated
2026-10-19T15:04:18.746Z

Briefing on Crescent C BESS

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
508 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-02-12
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Crescent C BESS is a 508 MW Battery project in Texas, currently active.

OCI La Salle ESS LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-02-12.

Queue ID
ERCOT-26INR0089
Location
La Salle, Texas
Technology
Battery
Developer
OCI La Salle ESS LLC
Market / region
ERCOT
Point of interconnection
Tap 345kV LOBO7A (#80219) - FOWLERTONSW5 (#5709) CKT#2

What stands out

1

Crescent C BESS is a 508 MW Battery project in Texas with status active.

2

OCI La Salle ESS LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-02-12.

Market and operating context

Queue date
2023-04-07
Proposed COD
2028-02-12
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Crescent C BESS — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0089
LocationLa Salle, Texas
TechnologyBattery
DeveloperOCI La Salle ESS LLC
Market / regionERCOT
Point of interconnectionTap 345kV LOBO7A (#80219) - FOWLERTONSW5 (#5709) CKT#2
Queue date2023-04-07
Proposed COD2028-02-12